The importance and characteristics of the crane installation

2015-01-12 10:52
The importance and characteristics of the crane installation
 
 
    Crane installation project is very important to their design and manufacture. Crane installation merits of the quality of the installation work ability, crane structure and component life, efficiency of crane design, production and use, and security has a great economic impact.
    Lifting equipment installation works out of the box from a starting device to device installed, and through commissioning, commissioning qualified; apply for project acceptance so far. Because the crane is special equipment, have higher risk characteristics, therefore, the crane installation, safety is especially important to pay special attention to the following aspects:
1, most of the huge crane structures, institutions complex machinery, it is often difficult overall transport is often split rear transport equipment to use the site as a whole assembly. Therefore, we must in order to reflect the overall eligibility properly installed by crane to verify the integrity and completeness of the crane machine.
2, the crane is running on a track or field of use of the building side. Therefore, its orbit or installed base, as well as the crane itself, is able to complement each other well, and the ability to run whether adapt to meet strict requirements, must be concluded by commissioning and testing after proper installation and installation .
3, crane safety is extremely demanding, safety devices must be properly equipped and installed, in order to achieve a reliable, flexible, and accurate technical requirements.
4, according to the importance of crane safety work, in order to put into use the crane to meet the operational requirements of a variety of loads, it is necessary according to the provisions of the crane load, full load, overload tests. These tests must be carried out in the operating state or a particular crane stationary state institution. This can only be used after the transfer request after installation crane load test.
5, the crane wire rope and other flexible parts and many other components, will be the first time after the occurrence of some elongation under load, deformation, loosening. It also requires the crane installation, commissioning loaded after repair calibration, adjustment, handling and fastening. Therefore, we must do the crane installation, commissioning, adjustment and some out of work, in order to ensure the future safety of the crane normally used.