Home>>News>>Use and maintenance of engineering machinery run-in period

News

Use and maintenance of engineering machinery run-in period

2015-01-13 09:05
Use and maintenance of engineering machinery run-in period
 
 
1. Because of construction machinery is special equipment, the operator should accept the manufacturer's training, guidance, structure of the machine, and there is a full understanding of the performance, and gain some experience before the operation and maintenance of the equipment. Manufacturers to provide product maintenance manual, the operator operates the equipment necessary information before operating the equipment, be sure to read the maintenance manual, according to the requirements of the specification operation and maintenance.
2. Note that the workload of the run, the run-in period, the workload is generally not exceed 80% of the rated working load, and to arrange for the work to prevent the machine for a long time continuous operation caused overheating occurs.
3. Note frequently observe the meter indication, abnormal, should be excluded stop in time, the reason is not found before the fault is not excluded, should cease operations.
4. Note that regular checks of lubricating oil, hydraulic oil, coolant, brake fluid and fuel oil (water) bit and quality, and pay attention to check the tightness of the machine. Inspection found that the lack of water too, should analyze the reasons. At the same time, it should strengthen the lubrication points in the run-in period are recommended to lubrication point greasing (except for special request).
5. Keep the machine clean, timely adjustment, tighten loose parts, to prevent loose parts or lead to increased wear and tear parts missing.
6. End of run-in period, forced to deal with machine maintenance, inspection and adjustment work to do, taking care to replace the oil.
In short term, engineering machinery use and maintenance requirements in the run-in period can be summarized as follows: to strengthen the training, to reduce the load, pay attention to check, strengthening lubrication. As long as the emphasis on the implementation of the project in accordance with the requirements of the mechanical run-in period of care and maintenance, it will reduce the incidence of early failure, prolong life and improve operating efficiency, the equipment to bring you more benefits.