Crossing the bridge over the transport and assembly machines

2015-01-23 13:45
Crossing the bridge over the transport and assembly machines
 
 
    Erecting machine due to its structural characteristics and special requirements of the road to walk on, and must be transported in a disassembled state, if necessary.
    1, the transport requirements
 parts sequentially numbered by class packing, afraid to touch, wearing parts individually packaged, and in the box filled spacers; mounting surface for machined parts to do preservation, and then packaged.
 removed parts should be numbered piece by piece, registration to prevent confusion.
 not packaged parts with paint fill in the name, number, and other markers on the surface of the installation site.
 surface should be oiled rope orderly wound on the reel.
 hydraulic hose packing should be smooth, not piled up, there should be no dead corner, hard discount, oil.
 box should be firm, packing parts should not do big pressure is small, lightweight not pressure.
 When lifting machinery lifting strict adherence to safety rules. ,
    2, the assembly site
 To open the assembly site, a length of about 70m, a width of about 30m.
 site compaction, fill the same standards should be shipped beam line.
 venues irregularities within 60m range of not more than 150mm.
 site without water, drainage measures.
 crane work area without the high-voltage power lines and other pass.
 installation technicians must be familiar with the installation of the machine structure, technical characteristics, hydraulic parts, electrical parts must have trained technicians conduct.
 conduct an inventory before the assembly.
 do the preparatory work required for installation tools and equipment.
 hydraulic components assembled: You must do the cleaning work carried out under the guidance of the engineer in charge.
 electrical components: Refer to the electrical schematics, carried out under the guidance of the engineer in charge.
 major steel bolt installation, should be symmetrical position of the bolt from the inside out in accordance with regulations.
 When lifting machinery lifting strict adherence to safety rules.