HZQ leg bridge machine installation and vertical shift
2015-02-02 15:36
HZQ leg bridge machine installation and vertical shift
Easy bridge machine vertical shift its legs generally have two, vertical shift using self-propelled vertical shift-car driver moving on the vertical shift rail. Traverse two legs, traverse guide beam 2, shifting the use of self-sliding flat car driven traverse guide beam movement, a lightweight, simple, one-step features.
After the group by measuring the position of the vertical shift track staked out bridge machine to make vertical shift work laying track. Note rail and sleepers with spike securely connected to prevent rail instability.
Before fixing the track will be good vertical shift vertical shift, rear leg position staked out before lifting a good vertical shift, rear leg, and with stopper fixed vertical shift drum. Crane installation before erecting machine vertical shift of Bailey truss the legs and Bailey truss and legs fixed.
After installation, support good sliding legs, with the installation of the crane down on sleepers, rail and crane etc. Sleepers To saws notch so embedded Bailey chords and securely with wire lashing. After the rails and sleepers connection with the spike fixed installation crane. Test erecting machine vertical shift time rollover resistance, stability, observing the walking speed, simultaneous case, the front portion of the swing and so, its operating procedures, see the bridge machine vertical shift processes. Then press the lifting process, test the bridge machine feed beams, lifting beam traversing bridge machine processes such as stiffness, strength and stability.
Easy bridge machine vertical shift its legs generally have two, vertical shift using self-propelled vertical shift-car driver moving on the vertical shift rail. Traverse two legs, traverse guide beam 2, shifting the use of self-sliding flat car driven traverse guide beam movement, a lightweight, simple, one-step features.
After the group by measuring the position of the vertical shift track staked out bridge machine to make vertical shift work laying track. Note rail and sleepers with spike securely connected to prevent rail instability.
Before fixing the track will be good vertical shift vertical shift, rear leg position staked out before lifting a good vertical shift, rear leg, and with stopper fixed vertical shift drum. Crane installation before erecting machine vertical shift of Bailey truss the legs and Bailey truss and legs fixed.
After installation, support good sliding legs, with the installation of the crane down on sleepers, rail and crane etc. Sleepers To saws notch so embedded Bailey chords and securely with wire lashing. After the rails and sleepers connection with the spike fixed installation crane. Test erecting machine vertical shift time rollover resistance, stability, observing the walking speed, simultaneous case, the front portion of the swing and so, its operating procedures, see the bridge machine vertical shift processes. Then press the lifting process, test the bridge machine feed beams, lifting beam traversing bridge machine processes such as stiffness, strength and stability.